A STEP-BY-STEP OVERVIEW TO INSTALLING A BATH TUB

A Step-by-Step Overview to Installing a Bath Tub

A Step-by-Step Overview to Installing a Bath Tub

Blog Article

Schedule Here

We've stumbled on this post about Tools You Need to Install a New Bathtub directly below on the internet and think it made perfect sense to relate it with you here.


Tools You Need to Install a New Bathtub
Setting up a bath tub isn't precisely brain surgery, but it does need strong plumbing, woodworking, and also often, tiling skills. Changing an old tub with a brand-new one is also a reasonably challenging project. If the old tub is readily accessible, the project can relocate rapidly; if you need to open up a wall surface to get rid of the old tub as well as position the new tub, the job is a lot harder. In either instance, the task is within a home handyman's skills, although you will require an assistant to vacate the old bathtub and set in the brand-new one. Make certain you have actually certified on your own for the job and are comfortable attempting it. Instead of working with a service provider to take over a halfway-completed project, it is better to think about utilizing one prior to you start. Opportunities are you might require a professional plumber to make tube links.
This write-up will certainly help you install a new bathtub in your restroom if you have already bought a brand-new bathtub and also don't require to transform the setup of your previous water system pipes.
Your tools and material list ought to comprise the following:
  • New Bathtub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Degree

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipeline Caps


  • Planning for the Setup


    First of all, the supporting frame provided with the bathroom must be fitted (if needed) according to the manufacturer's instructions. Next off, fit the faucets or mixer to the tub. When fitting the tap block, it is important to make certain that if the tap comes with a plastic washing machine, it is fitted between the bath and also the faucets. On a plastic bathroom, it is also sensible to fit a sustaining plate under the faucets system to prevent pressure on the tub.
    Fit the flexible faucet ports to the bottom of both taps making use of 2 nuts and also olives (often supplied with the bathtub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink outlet hole, and afterwards pass the outlet via the hole in the bathroom. Utilize the nut provided by the maker to fit the plug-hole. Analyze the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next, fit completion of the flexible overflow pipeline to the overflow outlet. Afterwards, screw the pipeline to the overflow face which need to be fitted inside the bath. Make sure you make use of all of the provided washing machines.
    Connect the catch to the bottom of the waste outlet on the tub by winding the string of the waste outlet with silicone mastic or PTFE tape, and also screw on the trap to the electrical outlet. Connect all-time low of the overflow tube in a similar manner.The bath need to now prepare to be suited its last setting.

    Removing Old Touches


    If you need to change old faucets with brand-new ones as a part of your installation, then the first thing you must do is separate the supply of water. After doing so, activate the faucets to drain any kind of water staying in the system. The procedure of removing the existing faucets can be rather bothersome as a result of the limited access that is often the situation.
    Make use of a container wrench (crowsfoot spanner) or a faucet device to reverse the nut that links the supply pipes to the taps. Have a towel all set for the continuing to be water that will originate from the pipes. When the supply pipes have been removed, utilize the same tool to loosen up the nut that holds the taps onto the bath/basin. You will require to quit the single taps from transforming during this procedure. As soon as the taps have actually been gotten rid of, the holes in the bath/basin will certainly need to be cleaned up of any kind of old sealing substance.
    Before carrying on to fit the brand-new faucets, contrast the pipe links on the old taps to the brand-new faucets. If the old taps are longer than the brand-new taps, after that a shank adapter is required for the new faucets to fit.

    Installing the Tub


    Making use of both wood boards under its feet, position the bathtub in the required position. The wooden boards are helpful in evenly spreading the weight of the bathtub over the area of the boards instead of focusing all the weight onto 4 tiny factors.
    The next goal is to ensure that the bath tub is leveled all round. This can be attained by examining the level and also readjusting the feet on the bathtub till the level reviews degree.
    To mount taps, fit the bottom of the outermost adaptable tap port to the proper supply pipeline by making a compression sign up with; after that do the same for the various other faucet.
    Activate the water supply and examine all joints and also brand-new pipework for leakages and also tighten them if needed. Fill up the tub as well as also examine the overflow outlet and also the regular electrical outlet for leakages.
    Lastly, fix the bath paneling as described in the manufacturer's instruction manual. Tiling and also securing around the tub must wait up until the tub has been used at the very least when as this will settle it into its final position.

    Suitable New Taps


    If the tails of the brand-new faucets are plastic, after that you will need a plastic connector to prevent damage to the string. One end of the adapter fits on the plastic tail of the faucet and also the various other end supplies a connection to the existent supply pipelines.
    If you require to fit a monobloc, after that you will certainly call for minimizing couplers, which links the 10mm pipe of the monobloc to the basic 15mm supply pipe.
    Next off, position the faucet in the mounting hole in the bath/basin making sure that the washers are in area in between the faucet as well as the sink. Secure the faucet in position with the maker provided backnut. As soon as the tap is safely in place, the supply pipes can be attached to the tails of the taps. The faucets can either be linked by using corrugated copper piping or with normal faucet connectors. The previous kind ought to be linked to the tap finishes first, tightening only by hand. The supply pipelines can later be connected to the various other end. Tighten up both ends with a spanner after both ends have been attached.

    Tiling Around the Tub


    In the area where the bathroom fulfills the ceramic tile, it is required to secure the joins with a silicone rubber caulking. This is essential as the fitting can relocate enough to fracture a stiff seal, causing the water to pass through the wall between the bath and also the tiling, resulting in issues with dampness and possible leakages to the ceiling listed below.
    You can choose from a range of coloured sealers to blend in your components as well as fittings. They are offered in tubes and cartridges, as well as are capable of securing gaps as much as a width of 3mm (1/8 inch). If you have a larger void to fill up, you can fill it with spins of soaked newspaper or soft rope. Bear in mind to always load the bathtub with water prior to sealing, to enable the movement experienced when the bathtub remains in use. The sealer can break rather early if you do not think about this movement prior to securing.
    Additionally, ceramic coving or quadrant floor tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and cut to size, are additionally easily offered on the marketplace. It is recommended to fit the ceramic tiles making use of water-resistant or water resistant glue and grout.

    Bathtub Installation


    How Important Is A Bathtub To Your Home?


    High-quality baths, showers, and other bathroom updates are necessary when considering a smart investment in your home. It’s a room that you go to every day and one that is constantly being used by guests.The bathroom is one of the top trafficked rooms in a home and also one of the most valuable in terms of home resale.


    Install Piping Before Tub


    You will be using your existing drain and waste vent system, but pipes required include the hot and cold water supply lines and a pipe leading to a shower head. A mixing valve and shower head are also needed. Air chambers may be required.


    Position the Tub


    Lower the tub into place so that the continuous flange fits against the wall studs and rests on 1’x4' or 2’x4' supports. Anchor the tub to the enclosure with nails or screws inserted through the flanges into the studs.



    NOTE: Remember, bathtubs and shower stalls may require support framing. A bathtub filled with water is extremely heavy, so check building codes and framing support before installing the tub.


    Assemble Drain Connections


    Assemble the bathtub drain connections by connecting the tub overflow with the tub drain above the trap, not beyond it. The trap will have a compression fitting that screws over the arm of the overflow assembly.


    Place a Pipe For the Shower Head


    First, locate a brass female threaded winged fitting and attach it to a framing support via a screw or a nail. Then run a pipe up the wall for the shower head. Sweat or solder the other side of the brass fitting to the top of the pipe.


    Attaching Hot and Cold Water Lines


    Attach your water lines for both hot and cold by sweating these directly into the hot and cold ports of the mixing valve. The mixing valve will be how water enters the tub’s system, not by the pipes themselves.


    Install the Spout


    Extend a piece of 1/2 inch pipe, or whichever length is specified in the manufacturer’s instructions, for the tub spout. Sweat on a male threaded fitting at the end of the pipe or use a brass nipple of the proper length and a 1/2 inch cap.



    NOTE: At this point you should have your rough-in plumbing work inspected before proceeding further.


    Check For Leaks


    Restore the water pressure and check the drain connection and the supply pipes for any sign of leaking.


    estore the Bathroom Wall


    Replace the wall with moisture-resistant drywall as a base for your wall covering. Seal the joints between the wall and your new tub with silicone caulk as protection against water seepage.

    https://www.berkeys.com/2016/12/02/bathtub-installation-dallas/


    Tools You Need to Install a New Bathtub

    I found that piece on How to Install a Bathtub when doing a search on the search engines. Liked our blog? Please share it. Help somebody else discover it. We love reading our article about Installing A Bathtub.




    Source This Article


    Report this page